Risk Assessment

Combined risk analysis integrating hazard, exposure, and vulnerability

Filter by Hazard:

Population at Risk

1,503,997

From flood

Assets at Risk

$4230.0M

Infrastructure & property

Very High Risk Areas

2

Requiring immediate action

High Risk Areas

2

Priority for intervention

Risk Calculation Formula

Risk Score = ∛(Hazard × Exposure × Vulnerability)

Where each component is normalized to 0-1 scale. Cube root ensures balanced weighting.

Hazard Score

Probability × Intensity

Exposure Score

Population × Assets

Vulnerability Score

Sensitivity / Adaptive Capacity

Risk Matrix

Hazard-Exposure vs Vulnerability (bubble size = population at risk)

very high
high
medium
low

Multi-Hazard Risk Comparison

Risk scores by district across all hazard types

Risk Assessment Details

DistrictHazard ScoreExposure ScoreVulnerabilityRisk ScorePopulationRisk Level
Kigamboni
flood
82%78%85%82%133,519very high
Ilala
flood
85%88%68%80%577,469very high
Temeke
flood
72%75%78%75%377,069high
Kinondoni
flood
65%70%52%62%176,819high
Ubungo
flood
58%55%62%58%239,121medium

Risk Assessment Methodology

Framework: Based on IPCC AR5 risk framework (Risk = f(Hazard, Exposure, Vulnerability))

Hazard Analysis: Climate models, historical data, return period analysis

Exposure Mapping: GIS overlay of hazard zones with population and asset data

Risk Classification: Very High (≥75%), High (60-74%), Medium (45-59%), Low (<45%)