Adaptation Scenarios

Cost-benefit analysis of adaptation measures and intervention planning

Filter by Category:

Total Investment Needed

$442.0M

All adaptation measures

Total Benefits

$1524.0M

Avoided losses

Average BCR

3.4

Benefit-Cost Ratio

Total NPV

$864.0M

Net Present Value

Benefit-Cost Ratio (BCR) Calculation

BCR = Present Value of Benefits / Present Value of Costs

BCR > 1 indicates a worthwhile investment; higher values mean better return on investment

NPV = Σ (Benefitt - Costt) / (1 + r)t where r = 3% discount rate

Benefit-Cost Ratio by Measure

Higher BCR indicates better return on investment

structural
nature based
institutional
social

Adaptation Measures Portfolio

Click to add to scenario builder
MeasureCategoryCostBenefitBCRNPVPriorityEffectiveness
Climate-Resilient Building Codes
Updated building codes requiring flood-resistant construction and heat mitigation measures
institutional
$5.0M$45.0M7.5$38.0Mhighmedium
Flood Early Warning System
Comprehensive early warning system with sensors, communication networks, and community alert protocols
institutional
$15.0M$85.0M4.2$52.0Mcriticalhigh
Mangrove Restoration
Restoration of 500 hectares of mangrove ecosystems along the coastline
nature based
$25.0M$95.0M3.2$58.0Mhighhigh
Msimbazi River Basin Restoration
Wetland restoration, riverbank stabilization, and green infrastructure along Msimbazi River
nature based
$85.0M$320.0M3.1$185.0Mcriticalhigh
Health System Preparedness
Strengthening health system capacity for climate-related health impacts
institutional
$22.0M$88.0M2.9$55.0Mhighmedium
Urban Green Spaces & Tree Planting
Expansion of urban parks and street tree planting for heat reduction
nature based
$18.0M$68.0M2.8$42.0Mmediummedium
Rainwater Harvesting Systems
Installation of rainwater collection systems in public buildings and informal settlements
structural
$12.0M$38.0M2.7$22.0Mmediummedium
Coastal Sea Walls & Defenses
Construction of sea walls, breakwaters, and coastal protection structures
structural
$120.0M$380.0M2.6$195.0Mcriticalhigh
Community Relocation Program
Voluntary relocation of households from highest-risk flood zones with housing support
social
$45.0M$125.0M2.5$72.0Mmediumhigh
Urban Drainage Upgrade
Upgrading storm water drainage capacity in flood-prone areas
structural
$95.0M$280.0M2.4$145.0Mhighhigh

Recommended Adaptation Pathway

Phase 1: Early Warning SystemPhase 2: Building CodesPhase 3: Drainage UpgradePhase 4: Nature-Based Solutions

This phased approach prioritizes high-BCR, low-cost measures first, building institutional capacity before major infrastructure investments.

Cost-Benefit Analysis Methodology

Benefits: Avoided damages, reduced losses, health benefits, ecosystem services

Costs: Capital costs, O&M, opportunity costs, implementation

Time Horizon: 30-year analysis period with 3% discount rate

Uncertainty: Monte Carlo simulation for confidence intervals